600 California: fire scope named in a filed permit.
A current public filing with the source language, what it means and what to check next.
600 California St · 9th floor
What changed
The filing says revised MEP, sprinkler and fire-alarm work will be design-build and submitted separately.
The main alteration permit is public and still marked “filed.” Its description names sprinkler and fire-alarm work, says that work is design-build, and says it will be submitted separately.
- Address, filed date, status and estimated cost
- Sprinkler and fire-alarm scope
- Design-build and separate-submittal language
- Confidence: high that fire scope exists; unknown whether it is still unassigned
- Call the GC or project contact and ask who owns the deferred fire package
- Request plans, bid timing and insurance requirements before treating it as an opportunity
Get 10-15 signals like this one.
The two-week pilot is $400 flat. Every signal arrives as a memo like this: record facts, source language, and a concrete next move.
Buy the pilot · $400 — checkout coming online
Card checkout is being switched on. To start this week, email research@outfallresearch.com and we will set you up directly.
Source: live DataSF API record. Public records can change; verify the live record before bidding.